Projects

    You Are Currently Here!
  • Home
  • Projects

Projects 2024

  • Fixed Jack Stand

    Fixed Jack Stand

    Design, fabricate and install customized jack stand as per client’s requirement for oil and gas pipe.
  • Gas Turbine Counter Weight Modification Work

    Gas Turbine Counter Weight Modification Work

    Gas turbine counterweight modification work involves assessing the current counterweights, modifying them to integrate new technologies, ensuring compliance with updated standards, and testing the modifications for improved performance and safety.
  • BHDE 8" Pipe Vises

    BHDE 8″ Pipe Vises

    To fabricate and install heavy duty permanent stand for pipe vises comes with base plate.
  • SL Pipe DN450 & SCH40

    SL Pipe DN450 & SCH40

    Supply SL Pipe DN450 SCH40. Delivered to project site, Baleh Hydroelectric Power Plant, Sarawak, East Malaysia.
  • Custom Workbench Fabrication

    Custom Workbench Fabrication

    Fabricate, paint, and supply the workbench in accordance with the client’s specifications and requirements. Delivered to Schlumberger work shop.
  • HPSK Stinger Flying Aluminium Box

    HPSK Stinger Flying Aluminium Box

    To fabricate and supply HPSK accessories flying box made with 3mm aluminium checker plate.
  • Modification Work Toward The Client's Advanced Gas Turbines

    Modification Work Toward The Client’s Advanced Gas Turbines

    Perform modification work on the client’s advanced gas turbines to improve their efficiency and performance.
  • Fabricate And Install Fence With Folding Gate At Client’s Property

    Fabricate And Install Fence With Folding Gate At Client’s Property

    To provide the client with a custom-designed fence along with a functional and durable folding gate, designed and installed according to their requirements, at the designated property location.
  • Crack Repair Works On Turbine Shell Casing

    Crack Repair Works On Turbine Shell Casing

    To perform crack repair works on a turbine shell casing, the process involves inspecting for cracks, preparing the surface, repairing the damage using methods like hardfacing welding, testing the repair for safety and functionality, and reassembling the turbine for use.

Projects 2023

  • 2nd MZART Custom Skid

    2nd MZART Custom Skid

    Fabricate and supply MZART Custom Skid with internal stainless steel storage tool chest for Schlumberger.
  • Supply The Heavy Duty Bin Rack

    Supply The Heavy Duty Bin Rack

    Fabricate and supply the Heavy Duty Bin Rack for shelving storage unit.
  • Replacement of Overhead Crane Structure

    Replacement of Overhead Crane Structure

    Remove the existing I-beam rail from the runway structure that was in the way before installing the new beam.
  • IRDV-KB Flying Box

    IRDV-KB Flying Box

    Fabricate and supply IRDV-KB Flying Box made with Aluminium Checker Plates with 3 compartments and 5 drawers.
  • Perform Wall Painting

    Perform Wall Painting

    Supply Manpower to Perform Wall Painting at The Pressure Testing Bay.

Projects 2022

  • Lifting Bails

    Lifting Bails

    Lifting bails can be used to lift drilling tools used for natural gas and petroleum. They are also used by persons in the areas of geographical exploration, and drilling engineering. The bails are also used to protect threads against damage while the items are being moved.
  • Plexiglass With A Frame

    Plexiglass With A Frame

    Fabricate and supply Plexiglass with a frame and deliver to Labuan, Sabah.
  • 40ft GP Container

    40ft GP Container

    Supply 40ft GP Container with steel base which is including air conditioner
  • Rotor Stand Project For Manjung T4 Planned Outage

    Rotor Stand Project For Manjung T4 Planned Outage

    Fabricate the Rotor Stand for Manjung T4 Planned Outage for General Electric Power Services Sdn Bhd and Tenaga Nasional Berhad (TNB) JanaManjung Sdn Bhd.
  • Weldmends / Crossover Pipe Stand Manjung

    Weldmends / Crossover Pipe Stand Manjung

    Design, execute, coordinate, and finish the Weldmends / Crossover Pipe Stand for General Electric Power Service (M) Sdn Bhd, Manjung with the aid of our skilled engineering team
  • Water Flow Meter

    Water Flow Meter

    Supply and install a water flow meter to the washing bay water outlet piping
  • Offshore Container Door Leaf

    Offshore Container Door Leaf

    Fabricate and install the Offshore Container Door Leaf (A60 Comply)
  • Aluminium Tool Storage Box

    Aluminium Tool Storage Box

    Fabricate and supply aluminium tool storage box with an open top.
  • MZART Custom Skid

    MZART Custom Skid

    Fabricate and supply MZART Custom Skid with internal stainless steel storage tool chest for Schlumberger.
  • Blower Skid

    Blower Skid

    Fabricate and install the blower skid, and repair a blower motor.

Projects 2021

  • Heavy Duty Grating Frame And Handrail

    Heavy Duty Grating Frame And Handrail

    Fabricate, supply, refurbish and install heavy duty grating frame and handrail for offshore platform comes with paint, finishing and bolting.
  • Base Plates At Velesto NAGA 8

    Base Plates At Velesto NAGA 8

    Perform hot work and remove all the existing structures of the base plates at NAGA 8 RIG and complete final welding at the rig by using the welded intermediate plate with full welding penetration.
  • Fabricate And Supply Aluminium Box

    Fabricate And Supply Aluminium Box

    Fabricate And Supply Aluminium Box Made with 3mm Aluminium Checker Plate comes with 4 Compartment and 4 Drawers within 18 working days.
  • Burner Boom Maintenance

    Burner Boom Maintenance

    Supply manpower for burner boom maintenance, fabricate and install handrail comes with yellow painting for burner platform
  • Evergreen Burner

    Evergreen Burner

    Fabricate, supply and install Evergreen burner support stand with 1680mm(H) x 775mm(W) and comes with 8 inches pipe clamp for Schlumberger
  • Fabrication Of 0ST &Amp; 1ST Breakout Machine Checkered

    Fabrication Of 0ST &Amp; 1ST Breakout Machine Checkered

    Fabrication of 0ST and 1ST breakout machine checkered plate 4.5mm including material, 3 layer painting and installation. Additionally, remove the existing SQ grating and replace with checkered plate 4.5.mm, comes with anti slip yellow black painting.
  • Jar Tester Platform

    Jar Tester Platform

    Fabricate, Supply and Install Jar Tester Platform
  • Hydraulic Table Lifter

    Hydraulic Table Lifter

    Fabricate and supply 500kg Hydraulic Table Lifter comes with a pipe roller support stand.
  • HPSK Stinger Flying Aluminium Box

    HPSK Stinger Flying Aluminium Box

    Fabricate and supply HPSK stinger flying aluminium box with 3 compartment dimensions.

Projects 2020

  • Fabrication Of Tools Storage Rack

    Fabrication Of Tools Storage Rack

    Design and fabricate U shape racking with 4 layer storage compartments for 10ft crossover containers
  • Fix The Main Base Plate

    Fix The Main Base Plate

    Drill and fix main base plate into ground concrete with 4 unit x 120mm wall plugs for Schlumberger.
  • Refurbishment Of LGKA Containers

    Refurbishment Of LGKA Containers

    Painting work with anti-corrosion undercoating paint.
  • Design, Fabricate And Fix The Heavy-Duty Pegboard

    Design, Fabricate And Fix The Heavy-Duty Pegboard

    Custom engineering and fabrication pegboard for Schlumberger sub-sea department.
  • Fabrication Of Solid Wood Box

    Fabrication Of Solid Wood Box

    Design and fabricate a solid wood box with timber woods.
  • Installation Of Slick Clamp Tower

    Installation Of Slick Clamp Tower

    Drill the concrete and use chemical capsule wall plug to install the tower after do balancing and alignment works.
  • Modifying The Tooling Rack

    Modifying The Tooling Rack

    Assemble and modification of a heavy machinery tooling rack based on the customer’s warehouse space.
  • 3 Phase Single Wound Step-Down Transformer

    3 Phase Single Wound Step-Down Transformer

    Supply transformer with primary and secondary voltage of 480VAC and 440VAC for Schlumberger offshore services with display panel consisting voltage, current and individual frequency for input and output.
  • Repair The Corrode Sanitary Pipe Lining

    Repair The Corrode Sanitary Pipe Lining

    Mild Steel Cement Lined Pipes were successfully and repair and replaced respectively. It is an underground pipe or tunnel system for transporting sewage from commercial buildings to treatment facilities or disposal.
  • JIB Crane Base Plate

    JIB Crane Base Plate

    Design and fabricate JIB Crane Base Plate as requested by Schlumberger and perform Magnetic Particles inspection (MPI) test to full fill the requirements of offshore standards.
  • HOF Base Plate

    HOF Base Plate

    Design and fabricate HOF Base Plate as requested by Schlumberger and perform Magnetic Particle inspection (MPI) test to full fill the requirements of offshore standards.
  • Deck Pad Eye For Horizontol Guyline 25T

    Deck Pad Eye For Horizontol Guyline 25T

    Fabricate 25T deck pad eye with full penetration welding and perform 37.5 tons of load test with pre and post Magnetic particles Inspection (MPI).
  • A60 Fire Rated Doors

    A60 Fire Rated Doors

    Fabricate and Install A60 Fire Rated Doors for Offshore Container.

Projects 2019

  • 120 Ton Rotar Lifting Beam Installation

    120 Ton Rotar Lifting Beam Installation

    Install 3 units of 120 ton rotar lifting beam with replacing all the missing parts. The beam was fabricated and installed after the load lifting tested.
  • Tools Storage Container Fabrication

    Tools Storage Container Fabrication

    Design and fabricate a LGKA tools storage container that can fit all the custom, electrical and general tools accordingly.
  • 7HA, 7HB, 9HA AND 9HB Trust Ring

    7HA, 7HB, 9HA AND 9HB Trust Ring

    CNC machining of trust ring with fabrication of metal storage box.
  • Renewal Of Bag Filter (480 Bags)

    Renewal Of Bag Filter (480 Bags)

    Supply labour, tools, transportation and other necessary equipment to renewal Bag Filter for Wesport YTL Slag Cement.
  • To Replace BC02 Tail Drum

    To Replace BC02 Tail Drum

    Dismantle existing BC02 Tail Drum and install a new one. Alignment and test run.
  • Replacement Of Corrode Incoming Water Pipe

    Replacement Of Corrode Incoming Water Pipe

    Perform pipe line welding by replacing incoming water pipe.

Projects 2018

  • Fabrication Of Main Warehouse Entrance Door

    Fabrication Of Main Warehouse Entrance Door

    Fabricate and modified warehouse entrance sliding door into 2 panels as it can be opened in 2 directions.
  • Isolation Gate For PD-4000ml-03

    Isolation Gate For PD-4000ml-03

    Supply, fabricate and installation of isolation gate sized approximately 1000mm (width) x 1300mm (height), steel staircase and platform. Reinstatement of hand railing works and civil concrete works to facilitate the installation of isolation gate.
  • Replacement Of Steel Platform

    Replacement Of Steel Platform

    Discharge steel shot for YTL Slag Cement Sdn Bhd.

Projects 2017

  • Main Incoming Mineral Shot

    Main Incoming Mineral Shot

    Replacement for an incoming mineral shot.
  • Packing Plant Side Guard Patching

    Packing Plant Side Guard Patching

    Packing plant discharge conveyor for Slag Cement Sdn Bhd Wesport.
  • Washer Box Installation

    Washer Box Installation

    Installation of washer box for belt conveyor supplied to Vale Malaysia Minerals.
  • Spillage Chute Renewal

    Spillage Chute Renewal

    Fabricate and renew spillage chute for BC03 at level 41m with 5mm steel plate to Slag Cement Sdn Bhd Wesport.
  • Preventive Tunnel Maintenance Shutdown

    Preventive Tunnel Maintenance Shutdown

    Klang Valley Mass Rapid Transit (KVMRT) Kajang.
  • Pan Conveyor Bucket

    Pan Conveyor Bucket

    Fabricate silica conveyor bucket.
  • Nozzle Support

    Nozzle Support

    The nozzle was fabricated using welding, cutting, and coating. The product was developed by referring to the drawing provided.
  • Installation Of Drainage Isolation Gate

    Installation Of Drainage Isolation Gate

    Design, fabricate, supply and install isolation gate for industrial water access located near existing construction ponds.
  • Fabricate Primary Crusher Mill

    Fabricate Primary Crusher Mill

    Dismantle, design, fabricate, machine, fitted, supply and install brand new ball crusher mill.
  • Major Stoppage KVMRT MMC Gamuda 9.5km Tunnel Maintenance Job

    Major Stoppage KVMRT MMC Gamuda 9.5km Tunnel Maintenance Job

    Mass Rapid Transit (MRT) Depot Kajang, Selangor
  • SUS 304 Dryer Fan

    SUS 304 Dryer Fan

    Fabricate and supply primary dryer fan material SUS 304.

Projects 2016

  • Imerys Minerals (M) Sdn Bhd Major Shutdown

    Imerys Minerals (M) Sdn Bhd Major Shutdown

    Major shutdown of the production plant to maintain its availability and operational utilization which involved the inspection, replacement or repair of those components that were worn or damaged.
  • YTL Slag Cement Sdn Bhd Shutdown 2016

    YTL Slag Cement Sdn Bhd Shutdown 2016

    Replacement shot, conveyors, pipelines, flanges, and valves.